Plumbing
Head Spa Shop Fit-Out Drainage
What we did
Drainage rough in for a new head spa shop. Everything set out in the slab before the pour.
- PVC drainage positioned for basins, wash points and floor wastes
- Falls set correctly the first time
- Pressure tested and photographed for the builder
Done right before the pour means nothing to chase in the concrete later.


